Cart
Free Shipping in Australia
Proud to be B-Corp

The Festiniog Railway from 1950 Andrew Wilson

The Festiniog Railway from 1950 By Andrew Wilson

The Festiniog Railway from 1950 by Andrew Wilson


$19.99
Condition - Very Good
Only 3 left

Summary

The history of the Festniog Railway from 1950

The Festiniog Railway from 1950 Summary

The Festiniog Railway from 1950 by Andrew Wilson

The Festiniog Railway can trace its history back to 1829 and it was constructed to serve the slate quarries in the area. It was built to the gauge of 2ft as this was the track width used in the quarries. Originally powered by gravity and horses, by 1863 steam had come to the line. In 1869 the first Fairlie-designed double locomotive appeared. The railway was built to serve the slate trade but by the First World War trade had declined due to a number of factors. Passenger traffic was by then the mainstay of trade and the summer tourists kept the line in profit. But the Second World War was to see the closure of the line. It lay after the war, neglected and vandalised, until 1950 when steps were made towards preservation. By 1954 that had become a reality and the wonderland of Wales was back up and running. Today it is one of the best known of Wales' narrow gauge railways.

Additional information

GOR002455662
9780752423975
0752423975
The Festiniog Railway from 1950 by Andrew Wilson
Used - Very Good
Paperback
The History Press Ltd
20020801
128
N/A
Book picture is for illustrative purposes only, actual binding, cover or edition may vary.
This is a used book - there is no escaping the fact it has been read by someone else and it will show signs of wear and previous use. Overall we expect it to be in very good condition, but if you are not entirely satisfied please get in touch with us

Customer Reviews - The Festiniog Railway from 1950